Sign In | Join Free | My futurenowinc.com
China FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD. logo
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD
Active Member

7 Years

Home > Single Sided Wall Formwork >

Steel Tunnel Formwork System With Information Automation System

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Contact Now

Steel Tunnel Formwork System With Information Automation System

Brand Name : ForPro

Model Number : Tunnel cons

Certification : ISO and CE

Place of Origin : shanghai

MOQ : 1 set

Price : US$116,000 /set to US$434,800

Payment Terms : L/C, T/T

Supply Ability : 200sets / year

Delivery Time : 15-20 work days

Packaging Details : Pallet

Application : tunnel lining, singled wall concrete

Size : length 9m to 12m, customized-product

material : full steel, electric travlling and hydraulic operation

Features : fair-faced concrete surface, information automatic storage

Color : brown or blue or client's enterprise color

Contact Now

Tunnel lining trolley with steel Formwork and information automation system

Outline

ForPro Tunnel formwork is an advanced tunnel formwork system, information automation system is available for the equipment. All information regarding concreting and vibrator working situation during whole construction process will be automatically collected and saved to PC of tunnel formwork system. With assistance of concreting automation system, pupe line will be dismantled, replaced, cleaned , re-connected and fixed automatically, one staff is enough to manage concreting, more labour costs will be saved on the jobsite. Cart will be drived by motor reducer and move forward along the rail.

Technical Specification
Cart length is from 9m to 12m

Cart is reusable and be drived forward by motor reducer

Formwork is erected and dismantled by hydraulic cylinde

Automatic information system is optional

Formwork sheet can be selected as steel plate or stainless steel

Applications

Steel Tunnel Formwork System With Information Automation SystemSteel Tunnel Formwork System With Information Automation System

FAQ
Q 1, Are you a factory or a trading company?
Yes,We are professional factory.

Q 2.Do you have strong techinicans teams?
Yes,We have 9 project designers, 4 product development engineers and 10 technical guidance engineers. The whole team has more than 20 years of engineering experience

Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.

Q 4. What is your production capacity?
3000Tons per month.

Q 5. Do you have test report?

yes, all of our products get the famous German Rhine certifications

Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.


Product Tags:

Steel Tunnel Formwork System

      

Advanced Tunnel Formwork System

      
Wholesale Steel Tunnel Formwork System With Information Automation System from china suppliers

Steel Tunnel Formwork System With Information Automation System Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)